ART.15 Track Circuit indicator Peg
It is a complementary signal consisting of a chisel-headed peg, half-colored red and half-colored yellow,
the upper edge is arranged perpendicularly to the track; it can be installed at the insulated joints of the track circuits (CDB);
the half painted in red is on the side of the rail insulated from earth, the one in yellow on the side of the Grounded rail.
At the end of a dead-end track, it can be installed in a single color (yellow or red).